|
Exterior Carpentry
Painter aluminium frames and 'Climalit' double glazing
Aluminium blinds
Interior Carpentry
Reinforced front door
Interior doors with a veneer finish in white
Built-in wardrobes with a veneer finish
Fitted bathroom furniture beneath a marble finish
Flooring
Marble flooring in living room, bedrooms & bathrooms
Ceramic flooring in kitchen & laundry room
'Clay' type ceramic in terraces
Tiling
Main bathroom with marble tiling
Kitchen & laundry room with 'clay' type ceramic tiling
Kitchen
Fully fitted kitchen including cooker (electric hob), over & extractor fan
Resort
24 hour video surveillance
Fenced resort with controlled access
Video doorman
Lifts from car park to apartments
Visitor car park
Lighting in gardens and swimming pool
Communal boiler for heating & hot water
Installations
Pre installation of air-conditioning in living room and bedrooms
Heating by radiators & gas boiler
Satellite TV & telephone sockets in bedrooms, living room & terrace
Roca or similar fitted bathrooms
Grohe or similar taps
Note: The above mentioned specifications could be subject to change as per the Project
Management decision. March 2005.
Return to New Developments
|